Atal Mission For Rejuvenation And Urban Transformation
Ministry: Ministry Of Housing & Urban Affairs
Providing basic services (e.g. water supply, sewerage, urban transport) to households and building amenities in cities which will improve the quality of life for all, especially the poor and the disadvantaged is a national priority.
About This Scheme
Benefits
The components of the AMRUT consist of capacity building, reform implementation, water supply, sewerage and septage management, storm water drainage, urban transport and development of green spaces and parks. During the process of planning, the Urban Local Bodies (ULBs) will strive to include some smart features in the physical infrastructure components.
The details of the Mission components are given below.
Water Supply- Water supply systems including augmentation of existing water supply, water treatment plants and universal metering.
- Rehabilitation of old water supply systems, including treatment plants.
- Rejuvenation of water bodies specifically for drinking water supply and recharging of ground water.
- Special water supply arrangement for difficult areas, hill and coastal cities, including those having water quality problems (e.g. arsenic, fluoride)
- Decentralised, networked underground sewerage systems, including augmentation of existing sewerage systems and sewage treatment plants.
- Rehabilitation of old sewerage system and treatment plants.
- Recycling of water for beneficial purposes and reuse of wastewater.
- Faecal Sludge Management- cleaning, transportation and treatment in a cost-effective manner.
- Mechanical and biological cleaning of sewers and septic tanks and recovery of operational cost in full.
- Construction and improvement of drains and storm water drains in order to reduce and eliminate flooding.
- Ferry vessels for inland waterways (excluding port/bay infrastructure) and buses.
- Footpaths/walkways, sidewalks, foot over-bridges and facilities for non-motorised transport (e.g. bicycles).
- Multi-level parking.
- Bus Rapid Transit System (BRTS).
- Development of green space and parks with special provision for child-friendlycomponents.
- Support structures, activities and funding support for reform implementation.
- Independent Reform monitoring agencies.
- This has two components- individual and institutional capacity building.
- The capacity building will not be limited to the Mission Cities, but will be extended to other ULBs as well.
- Continuation of the Comprehensive Capacity Building Programme (CCBP) after its realignment towards the new Missions.
- Purchase of land for projects or project related works,
- Staff salaries of both the State Governments/ULBs,
- Power,
- Telecom,
- Health,
- Education, and
- Wage employment programme and staff component.
Eligibility
- •
- •
How to Apply
The applicant need not apply for the scheme.
Projects will be executed by Urban Local Bodies (ULBs).
In case the ULBs do not have adequate capacity to handle projects, the State Government may recommend in State Annual Action Plan (SAAP), upon a Resolution passed by the ULB, for the execution of the projects by specialized parastatal agencies of the State or Central Governments. Such arrangements should necessarily be executed by way of a tripartite Memorandum of Understanding (MoU) amongst the State Government, the specialized Parastatal agencies and the concerned Municipality.
In such a case, the capacity of the ULBs will be augmented through the capacity-building component of the AMRUT. The maintenance and upkeep of the created assets will be the responsibility of the ULB and the State Government.
Quick Info
- Level
- Central Government
- Launched
- 25 Jun 2015
